Will it reach, and what will it take?
Pre-job screening for coiled tubing, wireline and jointed pipe, with the trip played out in an animated 3D view of the well.

The questions you ask before every job.
Change an input and every result updates: no menus to dig through, and the reason behind each warning is shown in plain words.

See the trip, not just the numbers
Play or scrub the run. The string is coloured by force, buckling, stress or wall contact, with the weight indicator beside it.

Weights and reach
Surface weight running in and pulling out, lock-up depth, and the set-down and overpull you can deliver at the BHA.

Hydraulics and cleanout
Pump pressure, bottomhole pressure and where the pressure is lost, with the rate needed to clean the hole.

Coiled tubing fatigue
Life used along the string for the job you plan, and how many times the job could be repeated.
In the free demo
- Three example wells: a horizontal coiled tubing cleanout, an extended-reach work string and a deviated e-line run
- Change the string, the fluid and the wellhead pressure
- Field or metric units
- A watermarked report to download
- No account, and nothing to install
In the full version
- Your own survey and completion, pasted from a spreadsheet
- Saved cases, compared side by side
- Reports that carry your company's logo and details
- One licence for the whole company
A screening aid, and a new one. The simulator is for deciding whether a job is workable before it is planned in detail. We are extending its checks against field jobs with early users. The engineer remains responsible for the job design.
The demo sends the numbers you enter to our calculation service to work out the results. It asks for no personal details.
Try it on a job of your own.
Open the demo first. If it looks useful, ask for a trial of the full version with your own well.
